{"id":29961,"date":"2021-12-12T00:40:22","date_gmt":"2021-12-11T19:40:22","guid":{"rendered":"https:\/\/pni.net.pk\/en\/?p=29961"},"modified":"2021-12-12T00:40:22","modified_gmt":"2021-12-11T19:40:22","slug":"k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in","status":"publish","type":"post","link":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/","title":{"rendered":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI"},"content":{"rendered":"<p>K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI<br \/>\nKarachi (PNI) Committed to the aim to expand its portfolio of clean energy, KE has allied with Sindh Energy Department (SED) and the World Bank to develop a solar park with an aggregate capacity of 350 MW under the ambit of the \u2018Sindh Solar Energy Project\u2019 (SSEP). The objective of SSEP is to increase solar power generation and access to electricity in Sindh Province. The purpose of this tripartite arrangement \u2013 formalized today with the signing of a Memorandum of Understanding (MoU) \u2013 is to develop and implement sustainable, cost-effective, and competitive utility-scale IPPsin Karachi under a competitive bidding structure.<br \/>\nThrough this collaboration, an additional 700 GWh of clean energy will be added to KE\u2019s electricity supply mix that should offset carbon emissions by 300-350 kilotons per annum. This is in line with the Government of Pakistan\u2019s aim, as stipulated in the Alternative and Renewable Energy (ARE) Policy 2019, of increasing the share of renewables (excluding hydel) as a share of the country\u2019s power generation capacity to 30% by 2030.<br \/>\nThe MoU was signed between Secretary, Energy Department, Government of Sindh, Abu Bakar Ahmed Madani, CEO K-Electric, Syed Moonis Abdullah Alvi, and World Bank Country Director for Pakistan, Najy Benhassine who joined via video from Islamabad.<br \/>\nThis tri-partite collaboration is being supported by the World Bank through development financing to the Government of Sindh for the implementation of SSEP. SED will be responsible for conducting relevant project-related studies, implementation of the competitive bidding process, and construction of any public sector infrastructure that is required. The solar IPPs would be constructed and owned by competitively selected private sector developers. Once complete, the power from the project (s) would be inducted into KE\u2019s grid via power off-take agreements, enhancing its ability to serve the current and evolving needs of its growing consumer base of 3.2 million.<br \/>\nSpeaking at the occasion, the Sindh Minister for Energy, Imtiaz Ahmed Shaikh commented, \u201cThis project has been in the works for some time and is being achieved with close collaboration and support of the stakeholders. The Sindh Energy Department is committed to making a meaningful contribution in the effort towards Pakistan&#8217;s cleaner and greener energy future, and we hope to share our learnings and experience at the national and international level to expand the scale of the impact.\u201d<br \/>\nCEO K-Electric Moonis Alvi also mentioned, \u201cWe appreciate the Sindh Energy Department and the World Bank for coming together on this historic event, which demonstrates our collective commitment towards the sustainable growth and future of Karachi and the Province of Sindh at large. At KE, environment and sustainability are integral parts of our strategy, focused on mitigating the impact of carbon and increasing KE\u2019s footprint of clean energy. We follow Environment and Sustainability Management Systems (ESMS) to ensure our business activities have a minimal harmful impact on our surroundings. As the only vertically integrated power utility company in Karachi, it is of utmost importance for us to ensure the availability of clean, reliable, and low-cost electricity for our consumers which will promote economic growth for Pakistan.\u201d<br \/>\nJoining remotely, Country Director for the World Bank Pakistan, Najy Benhassine said, \u201cTransitioning to renewable energy offers Pakistan the potential to reduce its generation costs, diversify away from imported fossil fuels, and realize climate change, air pollution, and water conservation benefits. Sindh Province is key to increasing the share of renewable energy generation in Pakistan and developing new ways of providing electricity access. This engagement between the World Bank, K-Electric, and the Sindh Energy Department, under the auspices of the Sindh Solar Energy Project, could provide a replicable model for expanding renewable energy and access to electricity in Sindh Province and Pakistan.\u201d<br \/>\nThe inclusion of 350 MW solar power would result in the diversification of KE\u2019s fuel mix and would increase the share of low-cost solar power generation in the system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI Karachi (PNI) Committed to the aim to expand its portfolio of clean energy, KE has allied with Sindh Energy Department (SED) and the World Bank to [&#8230;]<\/p>\n<p>\n","protected":false},"author":16,"featured_media":29962,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[14730,14729,64],"class_list":["post-29961","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-business-news","tag-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachi","tag-government-of-sindh","tag-k-electric"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI<\/title>\n<meta name=\"description\" content=\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\" \/>\n<meta name=\"twitter:description\" content=\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tuba Zafar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/\"},\"author\":{\"name\":\"Tuba Zafar\",\"@id\":\"https:\/\/pni.net.pk\/en\/#\/schema\/person\/0dfa6d46d29e252acc3c6eab88113eff\"},\"headline\":\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\",\"datePublished\":\"2021-12-11T19:40:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/\"},\"wordCount\":673,\"publisher\":{\"@id\":\"https:\/\/pni.net.pk\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg\",\"keywords\":[\"AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\",\"GOVERNMENT OF SINDH\",\"K-Electric\"],\"articleSection\":[\"Business &amp; Economy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/\",\"url\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/\",\"name\":\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\",\"isPartOf\":{\"@id\":\"https:\/\/pni.net.pk\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg\",\"datePublished\":\"2021-12-11T19:40:22+00:00\",\"description\":\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\",\"breadcrumb\":{\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage\",\"url\":\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg\",\"contentUrl\":\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg\",\"width\":660,\"height\":360},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pni.net.pk\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pni.net.pk\/en\/#website\",\"url\":\"https:\/\/pni.net.pk\/en\/\",\"name\":\"Pakistan News International\",\"description\":\"Latest News, Breaking News from Pakistan\",\"publisher\":{\"@id\":\"https:\/\/pni.net.pk\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pni.net.pk\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pni.net.pk\/en\/#organization\",\"name\":\"Pakistan News International\",\"url\":\"https:\/\/pni.net.pk\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pni.net.pk\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/site-logo.jpg\",\"contentUrl\":\"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/site-logo.jpg\",\"width\":431,\"height\":121,\"caption\":\"Pakistan News International\"},\"image\":{\"@id\":\"https:\/\/pni.net.pk\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/pni.net.pk\/en\/#\/schema\/person\/0dfa6d46d29e252acc3c6eab88113eff\",\"name\":\"Tuba Zafar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pni.net.pk\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/744ef34d1951e7021517824208536635504a982cfd8baa76dc349d66268b2063?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/744ef34d1951e7021517824208536635504a982cfd8baa76dc349d66268b2063?s=96&d=mm&r=g\",\"caption\":\"Tuba Zafar\"},\"sameAs\":[\"http:\/\/pni.net.pk\"],\"url\":\"https:\/\/pni.net.pk\/en\/author\/tuba\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","description":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/","twitter_card":"summary_large_image","twitter_title":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","twitter_description":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","twitter_image":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg","twitter_misc":{"Written by":"Tuba Zafar","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#article","isPartOf":{"@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/"},"author":{"name":"Tuba Zafar","@id":"https:\/\/pni.net.pk\/en\/#\/schema\/person\/0dfa6d46d29e252acc3c6eab88113eff"},"headline":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","datePublished":"2021-12-11T19:40:22+00:00","mainEntityOfPage":{"@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/"},"wordCount":673,"publisher":{"@id":"https:\/\/pni.net.pk\/en\/#organization"},"image":{"@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage"},"thumbnailUrl":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg","keywords":["AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","GOVERNMENT OF SINDH","K-Electric"],"articleSection":["Business &amp; Economy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/","url":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/","name":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","isPartOf":{"@id":"https:\/\/pni.net.pk\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage"},"image":{"@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage"},"thumbnailUrl":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg","datePublished":"2021-12-11T19:40:22+00:00","description":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI","breadcrumb":{"@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#primaryimage","url":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg","contentUrl":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/Untitled-2.jpg","width":660,"height":360},{"@type":"BreadcrumbList","@id":"https:\/\/pni.net.pk\/en\/latest-business-news\/k-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in-karachik-electric-government-of-sindh-and-world-bank-sign-mou-to-add-350-mw-of-solar-power-projects-in\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pni.net.pk\/en\/"},{"@type":"ListItem","position":2,"name":"K-ELECTRIC, GOVERNMENT OF SINDH, AND WORLD BANK SIGN MOU TO ADD 350 MW OF SOLAR POWER PROJECTS IN KARACHI"}]},{"@type":"WebSite","@id":"https:\/\/pni.net.pk\/en\/#website","url":"https:\/\/pni.net.pk\/en\/","name":"Pakistan News International","description":"Latest News, Breaking News from Pakistan","publisher":{"@id":"https:\/\/pni.net.pk\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pni.net.pk\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pni.net.pk\/en\/#organization","name":"Pakistan News International","url":"https:\/\/pni.net.pk\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pni.net.pk\/en\/#\/schema\/logo\/image\/","url":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/site-logo.jpg","contentUrl":"https:\/\/pni.net.pk\/en\/wp-content\/uploads\/2021\/12\/site-logo.jpg","width":431,"height":121,"caption":"Pakistan News International"},"image":{"@id":"https:\/\/pni.net.pk\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/pni.net.pk\/en\/#\/schema\/person\/0dfa6d46d29e252acc3c6eab88113eff","name":"Tuba Zafar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pni.net.pk\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/744ef34d1951e7021517824208536635504a982cfd8baa76dc349d66268b2063?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/744ef34d1951e7021517824208536635504a982cfd8baa76dc349d66268b2063?s=96&d=mm&r=g","caption":"Tuba Zafar"},"sameAs":["http:\/\/pni.net.pk"],"url":"https:\/\/pni.net.pk\/en\/author\/tuba\/"}]}},"_links":{"self":[{"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/posts\/29961","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/comments?post=29961"}],"version-history":[{"count":1,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/posts\/29961\/revisions"}],"predecessor-version":[{"id":29963,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/posts\/29961\/revisions\/29963"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/media\/29962"}],"wp:attachment":[{"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/media?parent=29961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/categories?post=29961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pni.net.pk\/en\/wp-json\/wp\/v2\/tags?post=29961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}